Heres the math for the above image:

9 sites per sf at 40g per site and 15 grow cycles per year=5.4 kg per sf per year

Lighting and hvac per sf= around 11w per sf so for 18 hrs for 365 days = 72.2 kwh

72.2/5.4= 13.4 kwh/kg (edited)

I would imagine at scale their power costs will drop to the 7-8 range so we’re ballpark

Another consideration is the japanese systems usually target 12-14 dli and we go higher at 14-16 to allow for crop diversity